Font ResizerAa
The Popular StoryThe Popular Story
  • Lifestyle
  • Sports
  • Entertainment
  • News
  • World
Search
  • Lifestyle
  • Sports
  • Entertainment
  • News
  • World
Follow US
Copyright © 2024 MP Media. All Rights Reserved.
The Popular Story > Blog > World > Artemis 2: NASA established contact with Artemis 2 after a 40-minute blackout |
World

Artemis 2: NASA established contact with Artemis 2 after a 40-minute blackout |

By Mohit Patel Last updated: April 7, 2026 5 Min Read
Share


Contents
NASA’s Orion goes silent behind the Moon before witnessing a rare total solar eclipseOrion surpasses historic deep space recordNASA prepares for April 10 splashdownHow NASA and the US Navy will retrieve orion
Artemis 2: NASA established contact with Artemis 2 after a 40-minute blackout

NASA‘s Artemis 2 mission has accomplished another difficult milestone by restoring essential communication with Mission Control after going dark for about 40 minutes previously. As the Orion spacecraft passed behind the far side of the Moon, there was a complete loss of radio communications due to the Moon blocking it. This ‘loss of signal’ (LOS) time was a true test of both the crew’s ability to function independently and of the automated systems of the spacecraft. The crew re-established contact with Mission Control at 7:24 PM (EDT) Eastern Daylight Time on April 6, 2026, and reported that all systems were performing as expected. This has been the longest distance humans have been into deep space, and it also lays the groundwork for the mission to return.

NASA’s Orion goes silent behind the Moon before witnessing a rare total solar eclipse

According to NASA, on April 6th, 2026, at 6:44 PM EDT, Orion traversed behind the moon (blocking the signals from NASA’s Deep Space Network), causing a Communication Blackout. Orion then performed its first close flyby of the Moon, at 7:02 PM EDT, flying just 4,067 miles above its surface. After restoring communication with the spacecraft, the Artemis II mission entered its unique solar eclipse phase at 8:35 PM EDT, where the crew experienced a total solar eclipse (where the Moon completely occluded Sun) for 53 minutes from the Orion’s perspective, providing them with an opportunity to study the solar corona (Sun’s outer atmosphere) without any interference from direct sunlight.

Orion surpasses historic deep space record

At 7:07 PM EDT, the Artemis II crew officially broke the previous human distance travelled record from Earth. Orion reached its maximum distance from Earth of 252,756 miles and was 4,111 miles farther than the crew of Apollo 13 set in April 1970, which was 248,655 miles. Artemis II achieved this milestone while its crew were conducting high-altitude lunar observation (collecting data on the Moon’s minerals & geology) utilising high-resolution imagery.

NASA prepares for April 10 splashdown

When Orion rose above the Moon at 7:25 PM EDT, the astronauts witnessed a beautiful ‘Earthrise’ as Mission Control obtained the signal from Orion. Over seven hours, the crew was able to use this observation period to visually confirm and record different parts of the Moon, such as the Orientale Basin and the Hertzsprung Basin. The spacecraft is now on a free-return trajectory, which uses the gravity of the Earth and the Moon to send the crew back to the Pacific Ocean for a splashdown on April 10.

How NASA and the US Navy will retrieve orion

NASA and the US Navy have started the mission recovery phase to bring the crew home safely. The USS John P. Murtha, a San Antonio-class amphibious transport dock ship, has left Naval Base, San Diego, to arrive at the designated recovery zone. The ship has special equipment, including a recovery cradle, high-speed boats, and other tools, that are specifically designed for retrieving the Orion capsule from the open ocean. NASA’s Exploration Ground Systems team is on board to coordinate the ‘Open Ocean Recovery’ operations.As of now, mission control is awaiting the exact time of splashdown. The planned time of splashdown is 8:07 PM EDT (5:07 PM PDT) on April 10. The planned location for splashdown is also in the Pacific Ocean, approximately 60 miles offshore from San Diego, California. At the time of splashdown, Navy divers will secure the capsule using a ‘horsecollar’ to stabilise it before winching the capsule into the flooded well deck of the USS John P. Murtha. This procedure allows for coordinated recovery operations, which will allow for the safe recovery of the astronauts and the return of the spacecraft for post-flight analysis.



Source link

Sign Up For Daily Newsletter

Be keep up! Get the latest breaking news delivered straight to your inbox.
[mc4wp_form]
By signing up, you agree to our Terms of Use and acknowledge the data practices in our Privacy Policy. You may unsubscribe at any time.
Share This Article
Facebook Twitter Email Copy Link Print
Leave a comment Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

SUBSCRIBE NOW

Subscribe to our newsletter to get our newest articles instantly!

[mc4wp_form]

HOT NEWS

NASA Artemis II ‘Moon Tunes’ playlist goes viral as astronauts make splashdown return to earth

The crew of Artemis II has officially returned, marking a major milestone in space exploration.…

April 11, 2026

Mohit Patel: The Visionary Mind Behind MP Media, Monax, and The Popular Story

In the competitive era of digital media, branding, and youth culture, very few names are…

April 23, 2025

At AI Summit, PM Modi’s nameplate carries a ‘Bharat’ message | India News

NEW DELHI: Prime Minister Narendra Modi on Thursday addressed the plenary session at the AI…

February 19, 2026

YOU MAY ALSO LIKE

Abu Dhabi Distance Learning Rules: Abu Dhabi distance learning rules 2026: Authorities mandates live classes and strict attendance tracking | World News

Abu Dhabi enforces strict distance learning rules attendance and live classes now compulsory / Image: file The Abu Dhabi Department…

World
April 11, 2026

Artemis II crew’s 10-day trip around Earth and Moon — timeline of Nasa’s historic lunar mission

Artemis II crew's 10-day trip around Earth and Moon — timeline of Nasa’s historic lunar mission Nasa’s Artemis II mission…

World
April 11, 2026

Is China preparing to supply weapons to Iran? US intelligence raises concerns

US intelligence assessments indicate that China is preparing to deliver new air defence systems to Iran within the next few…

World
April 11, 2026

‘Gesture’ before talks: US, Lebanon ask Israel for pause in strikes

Destruction in Lebanon (File photo) The Lebanese government and the administration of Donald Trump have asked Israel to pause its…

World
April 11, 2026
Copyright © 2020 MP Media All rights reserved.
Welcome Back!

Sign in to your account

Lost your password?