The Popular Story
  • About Us
  • Articles
  • Success Stories
  • Contact Us
  • About UsArticlesSuccess StoriesContact Us
HomeTop NewsEntertainmentSportsLifestyleAstrologyWorld
Magazine
All IssuesIconic Personalities of the Year 2026July 2026 | The Business Visionaries EditionThe Popular Story 40 Under 40Top 50 Iconic Personalities of 2026
Lists
40 Under 40Top 50 Iconic PersonalitiesIconic Personalities of the Year
Connect+
InstagramFacebookXYouTubeLinkedIn
All Categories
HomeTop NewsEntertainmentSportsLifestyleAstrologyWorldSuccess StoriesEducation & JobsBusiness & EconomyTechnologyMoney & Govt SchemesCricketAutoHealthTrendingGujaratRajasthanDelhi-NCRTravelFood & RecipesMagazine40 Under 40Top 50 Iconic PersonalitiesIconic Personalities of the YearAbout Us
Font ResizerAa
The Popular StoryThe Popular Story
Search
Follow US
Copyright © 2025-2026 MP Media. All rights reserved.
The Popular Story > Gujarat > Ahmedabad Metro Phase 2 Trains: Only 2 of 10 Delivered
GujaratTop News

Ahmedabad Metro Phase 2 Trains: Only 2 of 10 Delivered

By Khushbu Kumari Last updated: November 27, 2026 5 Min Read
Share
Ahmedabad Metro Phase 2 trains: a metro train on the Red Line in Ahmedabad
Featured image: Nizil Shah, via Wikimedia Commons (CC BY-SA 4.0)

Commuters waiting for shorter gaps between trains on the Ahmedabad-Gandhinagar corridor will have to wait longer. Gujarat Metro Rail Corporation (GMRC) has confirmed that only two of the ten new train sets ordered for Ahmedabad Metro Phase 2 have reached the Ahmedabad depot so far, more than three years after the contract was signed.

Contents
What was ordered, and whenA deadline that kept movingWhy Ahmedabad Metro Phase 2 needs these trainsWhat commuters should expect

The two trains are now going through testing and commissioning. GMRC told DeshGujarat, in a report published on November 25, that they will carry passengers only after all tests are complete and statutory safety approvals are in hand. A third set is expected soon, and the remaining seven will arrive in phases. No firm date has been given for the full fleet.

What was ordered, and when

The order went to Titagarh Rail Systems Limited, earlier known as Titagarh Wagons, in August 2023. The Letter of Acceptance was issued on August 29, 2023. Here is what the contract covers:

  • 30 standard-gauge coaches, making up 10 three-coach train sets
  • Value: about Rs 350 crore
  • Scope: design, manufacture, supply, testing, commissioning and staff training
  • Original timeline: a prototype within 70 weeks of the LOA and all sets within 94 weeks, which pointed to roughly June 2025 for full delivery

The new trains are meant to carry automated control systems, real-time monitoring, CCTV, integrated fire detection and more energy-efficient running gear.

A deadline that kept moving

The slippage has been visible for a while. Chief Minister Bhupendra Patel unveiled the first train set at Titagarh’s plant near Kolkata on December 20, 2025. At the time, PTI reported that the first train would be delivered within days and the other nine over the next five to six months.

By March 2026, GMRC was saying deliveries were expected to begin from June 2026. Now, at the end of November, the depot has two sets. In plain terms, the project is about 17 months past the original contractual target, and the bulk of the order is still to come.

Why Ahmedabad Metro Phase 2 needs these trains

Phase 2 is a 28.2 km extension that links Motera Stadium with Mahatma Mandir in Gandhinagar, with a branch towards GIFT City. Its estimated cost is Rs 5,384 crore. Parts of it have been running since 2024, but with trains drawn from the existing pool.

Across the operational network of about 68.2 km, roughly 32 train sets are in service. That fleet was sized largely for Phase 1. Stretching it over a longer network means fewer trains per kilometre, and that shows up as longer waits on the platform, especially on the Gandhinagar end where office and Secretariat traffic peaks in the morning and evening.

Demand is not the problem. In December 2025, PTI quoted a daily ridership of more than 1.6 lakh, with growth of 30 to 40 percent a year. Ten more trains would let GMRC tighten frequency without pulling sets off the older lines.

What commuters should expect

  • No immediate change: the two delivered trains cannot enter service until testing and approvals finish. GMRC has not said how long that will take.
  • Gradual improvement: as each set clears tests, frequency on the Gandhinagar side should improve step by step, not all at once.
  • Plan for gaps: regular riders between Motera, the Gandhinagar sectors and GIFT City should keep checking GMRC timetables, since current headways are set by the existing fleet.

The delay also matters beyond Ahmedabad. Gujarat has a separate order for 24 train sets for the under-construction Surat Metro, and the state’s wider push on urban transport, from metro lines to projects like the Vadodara Ring Road, depends on suppliers meeting their dates.

For now, the honest answer to “when will trains come more often?” is: once the remaining eight sets arrive and clear safety checks. GMRC has promised phased deliveries but has not put a calendar on them.

Reporting based on DeshGujarat, DeshGujarat (March 2026), PTI via Devdiscourse and The Metro Rail Guy.

Featured image: Nizil Shah, via Wikimedia Commons (CC BY-SA 4.0).

Subscribe to Our Newsletter

Subscribe to our newsletter to get our newest articles instantly!

[mc4wp_form]
TAGGED: Ahmedabad Metro, Gandhinagar, GMRC, Gujarat Infrastructure

Sign Up For Daily Newsletter

Be keep up! Get the latest breaking news delivered straight to your inbox.
[mc4wp_form]
By signing up, you agree to our Terms of Use and acknowledge the data practices in our Privacy Policy. You may unsubscribe at any time.
Share This Article
Facebook Twitter Email Copy Link Print
By Khushbu Kumari
Khushbu Kumari covers money, government schemes and Gujarat news for The Popular Story.
Leave a comment Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

SUBSCRIBE NOW

Subscribe to our newsletter to get our newest articles instantly!

[mc4wp_form]

HOT NEWS

Indian railway station platform, as travellers plan December 2026 long weekends

December 2026 Long Weekends: Christmas and New Year Trip Planner

Christmas 2026 falls on a Friday and New Year's Day 2027 does too, giving two…

November 25, 2026
Indian rupee banknotes, for planning a December budget

How to Make a December Budget for Weddings, Holidays and Winter Bills

Four steps to plan wedding gifts, travel and winter costs before December starts, without dipping…

November 23, 2026
Shimla covered in snow, a popular hill station trip in December

Planning a Hill Station Trip in December? What to Know Before You Go

Where you are more likely to see snow, how to handle mountain roads and what…

November 23, 2026

YOU MAY ALSO LIKE

SHRESHTA NETS 2027: Last Date Nov 30 for Free School Seats

Registration for SHRESHTA NETS 2027, which offers fully funded seats in private residential schools to SC and DNT students, closes…

Money & Govt SchemesTop News
November 26, 2026

Yamuna Pollution: Abul Fazal Drain to Carry Treated Water

A 2.8-km drain in south-east Delhi is being widened to carry treated water from the Okhla plant into the Yamuna…

Delhi-NCRTop News
November 27, 2026

Pink City Half Marathon 2026: PV Sindhu Joins Jaipur Run Nov 29

The 11th Pink City Half Marathon runs through Jaipur on Sunday, November 29, with 21.1 km, 10 km and 5…

RajasthanTop News
November 27, 2026

Gujarat High Court Railway Compensation Ruling: What It Means

The Gujarat High Court has set aside a tribunal order and told the Railways to pay Rs 8 lakh with…

GujaratTop News
November 27, 2026
Copyright © 2025-2026 MP Media. All rights reserved.

About Us

The Popular Story is a digital magazine and news publication bringing you stories from entertainment, sports, lifestyle, astrology and the world, with a focus on clear, original and reliable reporting.

Quick Links

  • About The Popular Story
  • Privacy Policy
  • Terms and Conditions
  • Disclaimer
  • Editorial Policy
  • Corrections Policy
  • Our Team

Follow us on Social Media

Explore

  • Contact Us
  • Entertainment
  • Sports
  • Lifestyle

Latest Magazine

View Magazine
© 2026 The Popular Story. All rights reserved.Privacy
Welcome Back!

Sign in to your account

Lost your password?